Passenger Elevators for Buildings & Apartments

The passenger elevator is the heart of a building's vertical transport. Choosing the right unit is about far more than capacity β€” speed, occupant traffic patterns, power consumption and ride comfort matter just as much. We start every passenger-lift project with a traffic study: how many people must move during peak hours, how many floors are served, and what waiting time is acceptable.

We supply energy-efficient gearless machine-room-less (MRL) passenger elevators that need no separate machine room, as well as machine-room units for tall, high-speed buildings. Value brands are available for budget-conscious buildings and premium international brands for hotels and Class-A towers.

Gearless passenger elevator installed in an office building lobby

Scope of work

  • Unit supply β€” passenger elevators for 6–24 persons (450–1,600 kg), 1.0–2.5 m/s, energy-saving gearless VVVF drive.
  • Full installation β€” guide rails, cabin, automatic doors, controller and wiring, through to test runs and commissioning.
  • Cabin finishes β€” hairline stainless, glass, mirror, laminated timber, plus COP/LOP panels with info displays and braille.
  • Safety features β€” ARD (automatic rescue device) on power failure, overload protection, door interlocks and light-curtain sensors.
  • Integration β€” card access, destination dispatch for high-traffic buildings and connection to the building BMS.

Who it is for

Offices of 3–40 floors, apartments and condominiums, hotels, mixed-use developments, government buildings and campuses. For low-rise buildings with simple access an MRL lift is the most economical choice; for tall towers we specify high-speed units with intelligent group control.

Installation timeline

Once the unit is on site and the civil shaft is ready, installing one passenger elevator usually takes 3–6 weeks including inspection. For new-unit procurement, add 8–14 weeks of production and shipping depending on brand and specification.

Safety standards & SNI

Every passenger elevator we install follows the Indonesian SNI elevator standards and Disnaker inspection requirements. We prepare the inspection documents and support issuance of the safety certificate so the lift can operate legally from day one.

Maintenance & modernization

After handover we offer maintenance & service contracts with genuine parts and 24/7 emergency response. For older, troublesome lifts, modernization & controllers can restore reliability without replacing the whole unit.

Indicative cost

Indicative installed prices for 2026 (indicative β€” request the catalog for final figures):

Type / ScopePrice range (IDR)
MRL lift 6–8 persons, 3–5 floorsIDR 250M – 420M
MRL lift 10–13 persons, 5–8 floorsIDR 420M – 750M
High-speed lift, buildings >8 floorsfrom IDR 800M / unit
Premium finish (glass/timber) per cabinadd IDR 40M – 120M

Indicative only β€” we send a written quote after reviewing the building specs. See also the pricing page.

We install passenger elevators across Jakarta and the Kalimantan cities. To start, send your floor count and desired capacity via WhatsApp.

Request Catalog via WhatsApp

Passenger Elevators β€” Common Questions

How much is a passenger elevator for a 5-storey building?
An MRL lift for 10–13 persons in a 5-storey building typically costs between IDR 420 million and 600 million per installed unit, depending on speed and cabin finish. We send a written quote after reviewing the specs.
What is an MRL lift and what are its benefits?
MRL (machine-room-less) is a gearless lift whose machine sits inside the shaft, so no rooftop machine room is needed. Benefits: space saving, up to 30% lower energy use than old hydraulic/geared lifts, and quieter operation.
Can the lift still be used during a power outage?
Our units include an ARD (automatic rescue device) that automatically brings the cabin to the nearest floor and opens the doors during a power failure, so passengers are never trapped.
How long does installation take?
Once the unit arrives and the shaft is ready, installing one passenger elevator usually takes 3–6 weeks including inspection. New-unit procurement adds 8–14 weeks of production depending on brand.

Ready to Start Your Elevator or Escalator Project?

Send your building specifications, number of floors or capacity needs via WhatsApp. We reply with a product catalog and a written quote β€” no consultation fee.

Request Catalog & Quote